These activities must be identified during feasibility and scheduled in advance to happen during venue access. Time must also be allocated during bump out to restore the venue to standard. Estimates and crew requirements are included below.
General
Seating Bank installation, removal or modification
Screwing or bolting into wood structure (e.g. floor) with large fixings (e.g. larger than 10mm)
Screwing or bolting into non-wood structures of any size. e.g. brick, plasterboard, metal or concrete
Removal or installation of additional scaff pipe or rigging overhead
Modifications, installation or removal of standard lighting grids or booms
Modifications to flooring either via direct paint/scenic work or change to floor surface or structure (e.g. traps)
Modification or relocation of Operating Positions
...
Removal, Installation or modification to Masking
2 sides only (strike or install requires 1x Tech Ops lead and 4 Student Crew)
Rear Wall Install or strike -
Modification | Details | Time and Labour | Tools Required | ||
---|---|---|---|---|---|
Masking | Side Walls Install or Strike | 1 hour 1x Tech Ops Lead + 4 Student Crew | Hex Head Coffin Lock Key | ||
Masking | Upstage Wall (moveable sections) | 1 hour 1x Tech Ops Lead + 2 Student Crew Platform Ladder Hex Head Coffin Lock key | Hex Head Coffin Lock Key | ||
Seating Bank | Full Bank install or strike | 4 hours 1x Tech Ops Lead + 6 Student Crew |
Reg Grundy
Reweighting counterweight fly lines (Students must be inducted before operating fly lines)
Removal or modification to fly pods.