Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

These activities must be identified during feasibility and scheduled in advance to happen during venue access. Time must also be allocated during bump out to restore the venue to standard. Estimates and crew requirements are included below.

General

  • Seating Bank installation, removal or modification

  • Screwing or bolting into wood structure (e.g. floor) with large fixings (e.g. larger than 10mm)

  • Screwing or bolting into non-wood structures of any size. e.g. brick, plasterboard, metal or concrete

  • Removal or installation of additional scaff pipe or rigging overhead

  • Modifications, installation or removal of standard lighting grids or booms

  • Modifications to flooring either via direct paint/scenic work or change to floor surface or structure (e.g. traps)

  • Modification or relocation of Operating Positions

...

  • Removal, Installation or modification to Masking

    • 2 sides only (strike or install requires 1x Tech Ops lead and 4 Student Crew)

    • Rear Wall Install or strike -

Modification

Details

Time and Labour

Tools Required

Masking

Side Walls Install or Strike

1 hour

1x Tech Ops Lead + 4 Student Crew

Hex Head Coffin Lock Key

3.5m Platform Ladder

Masking

Upstage Wall (moveable sections)

1 hour

1x Tech Ops Lead + 2 Student Crew

Platform Ladder

Hex Head Coffin Lock key

Hex Head Coffin Lock Key

3.5m Platform Ladder

Seating Bank

Full Bank install or strike

4 hours

1x Tech Ops Lead + 6 Student Crew

Reg Grundy

  • Reweighting counterweight fly lines (Students must be inducted before operating fly lines)

  • Removal or modification to fly pods.