Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

  1. Once set it clear, de-rig all lights and bring to the stage floor

    1. For the playhouse, all fixtures that are standard can stay in the catwalks but please still de-rig

  2. Separate venue standard equipment from borrowed equipment (leave in two separate areas) The venue coloured equipment is to stay, even if it is the same fixture type.

  3. Notify tech ops that you are ready for check in

    1. Tech ops will be busy during this time and if we are occupied in another venue, we wont be able to help. Best practice would be to book the check in the day before via an email to help/.techops@nida.edu.au

  4. Before items leave the venue they are to be checked in by a tech ops staff member, once checked in, immediately return the equipment to its correct storage location

    1. Equipment locations can be found in Cheqroom, L1 storage location indicates broad location and L2 storage location indicates the room - please do not just leave equipment outside tech prep/lighting cages unless directly instructed to by a member of tech ops staff.

    2. Any Broken equipment noticed on check in, please flag in cheqroom with details and let the tech ops staff member know.

...

These activities must be identified during feasability feasibility and scheduled in advance to happen during venue access. Time must also be allocated during bump out to restore the venue to standard.

...

  • Reweighting counterweight fly lines (Students must be inducted before operatomg operating fly lines)

  • Removal or modification to fly pods.