During Production Seasons (June Season, Spring Season and Festival of Emerging Artists) the Technical Operations department is on site to assist within the venue spaces.
...
Once set it clear, de-rig all lights and bring to the stage floor
For the playhouse, all fixtures that are standard can stay in the catwalks but please still de-rig
Separate venue standard equipment from borrowed equipment (leave in two separate areas) The venue coloured equipment is to stay, even if it is the same fixture type.
Notify tech ops that you are ready for check in
Tech ops will be busy during this time and if we are occupied in another venue, we wont be able to help. Best practice would be to book the check in the day before via an email to help.techops@nida.edu.au
Before items leave the venue they are to be checked in by a tech ops staff member, once checked in, immediately return the equipment can then be returned to its correct storage location. The time for the the check in needs to be booked with tech ops in advance and can take up to half an hour.
Equipment locations can be found in Cheqroom, L1 storage location indicates broad location and L2 storage location indicates the room - please do not just leave equipment outside tech prep/lighting cages unless directly instructed to by a member of tech ops staff.
Any Broken equipment noticed on check in, please flag in cheqroom with details and let the tech ops staff member know.
...
Screwing or bolting into wood structure (e.g. floor) with large fixings (e.g. larger than 10mm)
Screwing or bolting into non-wood structures of any size. e.g. brick, plasterboard, metal or concrete
Removal or installation of additional scaff pipe or rigging overhead
Modifications, installation or removal of standard lighting grids or booms
Modifications to flooring either via direct paint/scenic work or change to floor surface or structure (e.g. traps)
Modification or relocation of Operating Positions
Relocation of show relay microphones, or reprogramming feeds to dressing rooms or SMD
Relocation of Venue cameras or any standard venue equipment of a fixted nature (requires tools to remove).
Table of Contents | ||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|
|
...
PLAYHOUSE THEATRE | |||
---|---|---|---|
Modification | Details | Time and Labour | Tools Required |
Vomitory Installation or Removal | Removal or installation of Vomitory section of seating bank | 2 hours 1x tech ops lead + 2 Student crew | tbc |
Ligthting Boom Installation or Removal | Removal or installation of side lighting booms | 1 hour 1x tech Ops Lead + 2 Student Crew | Drill Philips head bit shifting spanner/socket set |
Mezanine Seating Modifications | Removal of Mezanine seats or hand rails | 3 hours (all seats and handrails) 1x Tech Ops Lead + 2 Student Crew | tbc |
STUDIO THEATRE | |||
---|---|---|---|
Modification | Details | Time and Labour | Tools Required |
Mezzanine Handrails | Removal of handrails on mezzanine. Either top section for audience viewing or entirely for design requirements | 1 hour + 1x Tech Ops lead + student crew | tbc |
Seating Bank | Installation or Removal of the Studio seating bank in it’s standard configuration | 3 hours 1x Tech Ops Lead + 6 Student Crew | Hex Head Coffin Lock Key |
Floor Traps Installation or Removal | Must be compliant with building code and returned to normal post production. Designs and merit require executive approval for structural modifications. | to be estimated based off plans. |
...