Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

During Production Seasons (June Season, Spring Season and Festival of Emerging Artists) the Technical Operations department is on site to assist within the venue spaces.

...

Info

All equipment will be checked prior to pick up and should be in good working order. If you have any problems with the equipment please let AV store know immediately, we can probably provide a replacement before you use/install the damaged equipment.

Venue Supervisors

During the production season Venue supervisors are on hand to assist, this is either a member of the full time team or may be a casual staff member.

Venue Modifications

During general venue access week modifications are made to the venues in order to facilitate the design. Some of these modifications require Tech Ops staff to either approve, do or lead the team of students.

...

PLAYHOUSE THEATRE

Modification

Details

Time and Labour

Tools Required

Vomitory Installation or Removal

Removal or installation of Vomitory section of seating bank

2 hours

1x tech ops lead + 2 Student crew

tbc

Ligthting Boom Installation or Removal

Removal or installation of side lighting booms

1 hour

1x tech Ops Lead + 2 Student Crew

Drill

Philips head bit

shifting spanner/socket set

Mezanine Seating Modifications

Removal of Mezanine seats or hand rails

3 hours (all seats and handrails)

1x Tech Ops Lead + 2 Student Crew

tbc

STUDIO THEATRE

Modification

Details

Time and Labour

Tools Required

Mezzanine Handrails

Removal of handrails on mezzanine. Either top section for audience viewing or entirely for design requirements

1 hour +

1x Tech Ops lead + student crew

tbc

Seating Bank

Installation or Removal of the Studio seating bank in it’s standard configuration

3 hours

1x Tech Ops Lead + 6 Student Crew

Hex Head Coffin Lock Key

Floor Traps Installation or Removal

Must be compliant with building code and returned to normal post production. Designs and merit require executive approval for structural modifications.

to be estimated based off plans.

...