During Production Seasons (June Season, Spring Season and Festival of Emerging Artists) the Technical Operations department is on site to assist within the venue spaces.
...
Info |
---|
All equipment will be checked prior to pick up and should be in good working order. If you have any problems with the equipment please let AV store know immediately, we can probably provide a replacement before you use/install the damaged equipment. |
Venue Supervisors
During the production season Venue supervisors are on hand to assist, this is either a member of the full time team or may be a casual staff member.
Venue Modifications
During general venue access week modifications are made to the venues in order to facilitate the design. Some of these modifications require Tech Ops staff to either approve, do or lead the team of students.
...
PLAYHOUSE THEATRE | |||
---|---|---|---|
Modification | Details | Time and Labour | Tools Required |
Vomitory Installation or Removal | Removal or installation of Vomitory section of seating bank | 2 hours 1x tech ops lead + 2 Student crew | tbc |
Ligthting Boom Installation or Removal | Removal or installation of side lighting booms | 1 hour 1x tech Ops Lead + 2 Student Crew | Drill Philips head bit shifting spanner/socket set |
Mezanine Seating Modifications | Removal of Mezanine seats or hand rails | 3 hours (all seats and handrails) 1x Tech Ops Lead + 2 Student Crew | tbc |
STUDIO THEATRE | |||
---|---|---|---|
Modification | Details | Time and Labour | Tools Required |
Mezzanine Handrails | Removal of handrails on mezzanine. Either top section for audience viewing or entirely for design requirements | 1 hour + 1x Tech Ops lead + student crew | tbc |
Seating Bank | Installation or Removal of the Studio seating bank in it’s standard configuration | 3 hours 1x Tech Ops Lead + 6 Student Crew | Hex Head Coffin Lock Key |
Floor Traps Installation or Removal | Must be compliant with building code and returned to normal post production. Designs and merit require executive approval for structural modifications. | to be estimated based off plans. |
...