During Production Seasons (June Season, Spring Season and Festival of Emerging Artists) the Technical Operations department is on site to assist within the venue spaces.
...
During the production season Venue supervisors are on hand to assist, this is either a member of the full time team or may be a casual staff member.
More information will be added here soon about who they are, how they can assist and how to identify them.
Venue Modifications
During general venue access week modifications are made to the venues in order to facilitate the design. Some of these modifications require Tech Ops staff to either approve, do or lead the team of students.
...
PLAYHOUSE THEATRE | |||
---|---|---|---|
Modification | Details | Time and Labour | Tools Required |
Vomitory Installation or Removal | Removal or installation of Vomitory section of seating bank | 2 hours 1x tech ops lead + 2 Student crew | tbc |
Ligthting Boom Installation or Removal | Removal or installation of side lighting booms | 1 hour 1x tech Ops Lead + 2 Student Crew | Drill Philips head bit shifting spanner/socket set |
Mezanine Seating Modifications | Removal of Mezanine seats or hand rails | 3 hours (all seats and handrails) 1x Tech Ops Lead + 2 Student Crew | tbc |
STUDIO THEATRE | |||
---|---|---|---|
Modification | Details | Time and Labour | Tools Required |
Mezzanine Handrails | Removal of handrails on mezzanine. Either top section for audience viewing or entirely for design requirements | 1 hour + 1x Tech Ops lead + student crew | tbc |
Seating Bank | Installation or Removal of the Studio seating bank in it’s standard configuration | 3 hours 1x Tech Ops Lead + 6 Student Crew | Hex Head Coffin Lock Key |
Floor Traps Installation or Removal | Must be compliant with building code and returned to normal post production. Designs and merit require executive approval for structural modifications. | to be estimated based off plans. |
...
Reweight fly lines
Swinging Bars
Operate Pit Lift in Parade
Venue Standards
Venue tech specs can be found here Venue Information - Technical Specifications
It is best to check these documents prior to bump in as they are continually updated.
It is the ongoing expectation with the use of theatre spaces that the room is returned to standard at the conclusion of every production, regardelss of how the room was found. There may be some things that are either pre-done or requested to vary from standard to maximise efficient use of the venues. This is standard industry practice and good to replicate.
General Guidelines:
Leave the room how you wish you found it (not how you actually found it)
Technical Operations may ask for modifications to standard on bump out in order to make the next bump in quicker. This work would be the equivalent to or less work than returning to standard. e.g. modify seating bank rather than complete strike.
Modifications may be made by the previous user to the room prior to your arrival to assist in your bump in. Every attempt will be made to communicate all changes when possible however minior variations may not be noted, however shouldn’t have an impact on bump in time except make bump in quicker.
Always refer to the venue standards when working out your bump out checklists, do not base it off how you found the room.
Whilst every effort is made to keep tech specs up to date for each venue, there will always be minor corrects, please email anything you notice as incorrect or missing to techops@nida.edu.au so we can update the files.
Contacting Technical Operations
...